Deliver Projects On Schedule.
With Full Visibility.
secqr® CxP runs data center commissioning in one software, from design review through to integrated systems testing. Gate every level, verify and witness scripts on mobile, close issues with evidence, and see real time progress across every vendor and stakeholder, right up to handover.
One platform for greenfield design review, testing and commissioning
Every part of data center commissioning, from design review to auto generated reports, connected around a single source of truth.
Design Review (L0)
Consultant drawings reviewed discipline by discipline
Planning & Scheduling
Daily, weekly, and on demand
True Offline
Native Android and iOS field app
Performance & Progress Reports
DPR, vendor performance, timeline performance
Analytics Dashboard
Live progress by vendor, location and level
Mobile Assisted Field Testing
FAT, SAT, L1 to L5 across all equipment
Issue Management
Track Issues with Ageing Visibility
Script Based Verification & Witness
L1 to L5 with Rule Based Validations
Multiple Stakeholders Management
Contractors, CxA, testing agency, OEMs, design consultants
RFIs & Documents
RFIs answered by link; drawings offline on mobile
One system, tailored to every stakeholder
Role based access and dashboards, from the data center owner to the field engineer on site, and the design consultant.
Data Center Owner
Is my facility going to be ready on time?
One screen across every system, location, and vendor, with milestones tracked against baseline and live punch list closeout.
Commissioning Agent
Nothing progresses until it is proven.
L1 to L5 stage gates with sign offs, issue turnaround with auto escalation, and ready made progress reports.
General Contractor
What is blocking my sequence?
Rolling seven day plans, a filtered view of every vendor issue with evidence, and consolidated daily site logs.
Vendor / Subcontractor
Just show me my scope.
A scope limited view of their own equipment, checklists, and issues, with report submission and revision history.
Field Engineer
Capture it fast, on site.
Mobile checklist execution, one tap punchpoint logging with photos, and offline mode with safe sync.
Viewer
Give me visibility, read only.
Read only access for clients, consultants, and external stakeholders, scoped to what they should see.
Design Consultant
Which comments do I need to answer?
Opens a secure link with no account, sees only the comments sent to their firm, replies to each one and uploads revised drawings.
Client
What did the review find, and is it fixed?
Their own login to follow what was sent to them, respond, and question a comment that was closed.
Four phases to successful handover
Take your project from design review to a fully documented, transparent handover.
Setup
Import equipment, define stages, map script templates to equipment types, and assign responsible vendors.
Review Design
Consultant drawings are reviewed discipline by discipline. Approved comments go to the consultant and client and are tracked to close.
Execute
Daily plans generate automatically. Field teams execute tests, complete checklists, and raise issues on mobile, even offline. Progress syncs when back online.
Report
Reports auto generate from field data. Dashboards show progress by location, vendor, and stage, through to complete handover documentation.
Nothing moves until it is ready
Gated stages, enforced dependencies, and zero silent slippage, purpose built for large scale MEP commissioning.
Gated Levels
A level can't be closed while tests, issues or test reports are still open. Only an authorised lead can override, and must write down why.
Dependencies Mapped
Four dependency types link scripts, issues, and activities together.
Blockers Hold The Line
A test, issue or activity that others depend on holds them back until it is cleared.
Offline Conflict Resolution
When two people edit the same record offline, changes queue for safe review. No silent data loss.
Vendor Performance Metrics
Built in KPIs track completion rates, on time delivery, average delays, and repeat issues.
Full Accountability
Sign-offs, reviews and status changes are recorded with who and when, with role based access down to field level.
One day slipping can drift your entire project timeline.
Data centers lose crores per day for delays. Most delays happen not because of equipment, but because of coordination gaps, missing test readiness, manual checklists, and unclear progress.
- Blockers surface early, not during integrated systems testing.
- Auto generated priority reports show the critical blockers whenever you need them.
- The replanning wizard re-plans the remaining work and shows the recovery path as soon as a delay is known.
secqr® CxP protects your commissioning deadlines, gives real time control across projects, ends coordination chaos, and hands over clean records to operations.
Role Based Access Control
Multi layer permissions down to field level.
Audit Trails
Sign-offs, reviews, logins, exports and role changes logged with user and time.
Vendor Data Isolation
Multi tenant scoping. Vendors see only their data.